EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
-
Deburring front spar...
-
Piece gathering
-
Wing spar...
-
Bellcrank assemblies...
-
Wing truss joined to...
-
Ribfest
-
Cleco ribs to rear spar
-
Rivet ribs to front...
-
Aileron and flap...
-
Aileron cable (left)...
-
Landing light lens...
-
Landing light lens...
-
Dimple leading edge...
-
Countersink front...
-
Cleco top skin (left...
-
Pull countersink...
-
Riveting top skin...
-
Continue riveting...
-
Begin fitting flap /...
-
Rivet flap /aileron...
-
Turn left wing over...
-
Wiring left wing
-
Plumb pitot lines...
-
Gretz pitot mount...
-
Gretz pitot mount pt 2
-
Gretz pitot mount pt 3
-
Plumb pitot lines...
-
Fitting lower skin ,...
-
Rivet bottom skin...
-
Riveting bottom skin...
-
Rivet inspection...
-
Store wing, begin...
-
Left flap assembly
-
Assemble / rivet...
-
Left aileron assembly
-
Test fit left...
-
Right wing started
-
RH landing light...
-
Strut truss fittings...
-
Bolt truss to front...
-
Assemble interior of...
-
Aileron cable and...
-
Flap cable, electric...
-
Match drill RH...
-
Riveting top skin
-
Riveting top skin RH...
-
Flap & aileron...
-
Scotchbright rivets...
-
Flip RH wing for...
-
Countersink leading...
-
Nearly finish...
-
Finish riveting...
-
RH flap construction
-
Finish RH flap
-
Assemble RH aileron.
-
Wingtip support rib...
-
Wing tip cutting
-
Cutting form/jig to...
-
Glue first (left)...
-
Rivet doublers...
-
Reglue open area...
-
Fitting left wingtip
-
Left fuel tank &...
-
Left tank filler cap...
-
Left tank fittings
-
Left filler cap...
-
Rivet left root rib
-
Finish riveting left...
-
Trim right wing tip
-
Fitting RH wing tip
-
Fitting RH wing tank
-
RH Tank fitting
-
R H tank filler cap...
-
RH tank fittings...
-
RH filler opening...
-
R H root rib riveted...
-
Sealing RH filler...
-
Wing tip
-
Wing tips body work
-
Sanding primer
-
Torque Wing Attach...
-
Correct Aileron...
-
Aileron cable tensioned
-
Finish cut wing...
-
Fitting/adjusting...
-
Rigging ailerons
-
Right side flap gap...
-
Adjusting flap...
-
Left flap gap seal
-
Wing lower gap seal...
-
Wing lower gap seal...
-
Wing root cuffs bonded
-
Pushrod ends all...
Controls
- (10)
Avionics
- (10)
Lighting
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
Jul 23, 2020
Aileron cable (left) and wire grommets, flap cable
- (2.0 hours)
Category: Wings
Determined proper orientation of aileron cable and install, safety wire to bell crank. Drilled electrical wire grommet holes to size and install grommets. Installed telex cable for flaps and safety wired to anchor.
0B06A554-0D95-4632-8E2D-233D33E57BBF.jpeg
15F9D549-668E-456E-A7A0-F2FC9FB048B1.jpeg
6D0EFA41-4566-4499-9187-3115AA6DEAFE.jpeg
7276B4CE-4AA8-471E-9497-DF270DF4AB75.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.